01. Project Challenges: Enclosing a Large Public Swimming Pool
Before installation, the open public pool faced four project-specific challenges documented in the source material:
- Strong solar exposure and evaporation: intense sunshine increased water evaporation and chemical degradation, affecting operating efficiency during peak daytime use.
- Dust and sand infiltration: seasonal wind carried debris into the pool basin, increasing filtration demand and recurring manual cleaning.
- 22 m column-free clear span: the operator required an unobstructed span across the pool and perimeter concourse to preserve swimming lanes, lifeguard sightlines and safe circulation.
- Flexible dual-mode operation: the enclosure needed to provide a protected indoor pool environment during adverse weather and retract for open-air swimming when conditions were suitable.
02. Motorized Retractable Pool Enclosure Design
2.1 Bi-Parting Center-Opening Telescopic Geometry
SUNRAY developed a center-opening telescopic enclosure so the 33 m long structure could retract toward both ends of the pool concourse. This layout reduces central stacking volume and distributes movement across two symmetrical halves.
- Symmetrical center split: both enclosure halves retract outward from the center.
- Long-span multi-arch form: the structure covers the 22 m clear span without intermediate interior columns.
- Polycarbonate enclosure: 6 mm multi-layer UV co-extrusion solid sheets form the roof and wall envelope.
- Architectural integration: the project source specifies a charcoal-gray powder-coated finish coordinated with the surrounding facility.
03. Shop Drawings and Long-Span Structural Detailing
The engineering package translated the concept into fabrication and installation drawings with full-scale dimensions for the 33 m × 22 m enclosure.
- Roof framing and plan elevation: 33,000 mm overall length with track centerlines and synchronized drive layouts.
- Transverse geometry: 22,000 mm clear span, 20,504 mm internal clearance span, 7,000 mm ridge height and 3,596 mm eaves height.
- Main rafters: 258 × 110 × 8 mm 6063-T6 aluminum extrusion.
- Internal reinforcement: 223 mm wide × 25 mm thick galvanized Q235 steel flitch plate, laser-cut and bolted through the profile web chambers.
- Sealing and drainage: continuous EPDM gaskets combined with secondary aluminum drainage channels at panel overlap joints.
04. FEA and Wind-Load Verification
4.1 MIDAS/Gen 2022 Structural Model
Because of the 22 m clear span and 7 m ridge height, the project source includes a spatial 3D finite element analysis completed in MIDAS/Gen 2022. The model contains 1,450 nodes and 2,825 elements, including 1,543 beam elements and 1,282 plate elements.
4.2 Material and Wind Design Inputs
- 6063-T6 aluminum: yield strength fy = 160 MPa; project design value fd = 140 MPa; shear design value fvd = 81 MPa; density = 2,648 kg/m³.
- Q235 steel reinforcement: yield strength fy = 235 MPa; project design strength fd = 215 MPa; shear design value fvd = 125 MPa.
- Design wind speed: 36.9 m/s.
- Basic wind pressure: W0 = 0.85 kN/m².
- Peak governing wind pressure: Wk = 1.16 kN/m².
- Roof uplift wind suction: Wk = -1.01 kN/m².
4.3 Stress, Deflection and Foundation Reactions
- Maximum calculated stress: 101.0 MPa under the stated critical load combination, compared with a project allowable stress of 140.0 MPa.
- Maximum spatial displacement: 19.0 cm under the stated standard load combinations; the source records checks against L/250 vertical deflection and H/150 column-top lateral drift criteria.
- Maximum column-foot reaction: Fx = -7.99 kN; Fy = -4.91 kN; Fz = -26.08 kN.
05. Precision Manufacturing and Quality Control
The project source emphasizes machining accuracy because tracking deviations across a large moving span can affect drive alignment and smooth operation.
- CNC profile processing: compound-angle milling, drainage-slot machining and bolt-hole positioning on the primary aluminum rafters.
- Laser-cut reinforcement plates: 25 mm galvanized steel plates fabricated with precision bolt patterns and weight-relief openings.
- Architectural powder coating: multi-stage pretreatment and outdoor-grade powder coating; the source states 2,000+ hours of neutral salt-spray resistance.
06. 1:1 Full-Scale Factory Pre-Assembly and Commissioning
Before export, SUNRAY carried out a 1:1 full-scale factory pre-assembly on full-length tracks. This stage was used to verify component fit-up, track geometry, structural clearances and motorized movement before shipment.
- Full-span assembly: the complete 22 m span × 33 m length arch structure was erected at the factory test site.
- Drive and track testing: the source records electric drive synchronization, remote-control response and anti-lift safety checks over more than 100 continuous operating cycles.
- Clearance verification: the full-scale assembly was checked for structural and operational clearance.
- Component coding: rafters, cross-ties and track rails were marked with alphanumeric IDs corresponding to the assembly documentation.
07. Export Packaging and Container Preparation
- Protective wrapping: architectural profiles were individually wrapped to reduce transport abrasion.
- Bundled long members: structural profiles were strapped into transport bundles with timber separation.
- Moisture-resistant outer packaging: bundles were covered for marine shipment.
- Container planning: the project source records loading planning for 40 ft HQ sea containers with itemized packing manifests.
08. On-Site Installation and Technical Supervision
After overseas delivery, the modular enclosure was erected with the local contractor team using prepared components and crane-assisted lifting.
- Bolted field assembly: the source records pre-drilled components assembled without on-site cutting or welding.
- Crane-assisted modular hoisting: roof and wall structural modules were lifted sequentially onto leveled guide tracks.
- SUNRAY technical supervision: project specialists supported rail calibration, electric motor synchronization and weather-seal installation.
09. Project Results: Flexible Enclosed and Open-Air Pool Operation
The completed motorized retractable pool enclosure gives the facility a single structure that supports both protected indoor use and open-air swimming. The source project records the following operating results:
- Approximately 180-second opening or closing time for the complete 22 m × 33 m enclosure using the motorized drive.
- 6 mm polycarbonate panels stated to block 99.9% of UV radiation while preserving high natural daylight transmission.
- Project records report reduced dust and debris ingress, together with lower filtration backwash frequency and chemical usage.
Why This Solution Fits Large Public and Commercial Pools
- Large column-free coverage supports clear swimming lanes, lifeguard sightlines and deck circulation.
- Motorized telescopic opening allows one facility to switch between enclosed and open-air operating modes.
- FEA verification, detailed shop drawings and 1:1 factory pre-assembly reduce uncertainty before overseas installation.
- Modular fabrication and bolted assembly support controlled cross-border delivery and on-site erection.
Project Testimonial
“Executing a 22-meter clear span over an active public pool seemed like a high-risk structural challenge. Sunray's structural calculations, rigorous pre-assembly in China, and turnkey bolted engineering eliminated all on-site surprises. The pool enclosure survived multiple desert storm seasons with zero leaks, zero track binding, and tremendous public acclaim.”
- DANZIV Nissim Project Management Team, Middle East
Planning a Public Pool Enclosure Project?